Burwell Local
At a glance
Generation headroom, free
Red
No headroom
Source UKPN DFES Network Headroom Report (three category rows per site), retrieved 20 Oct 2026Highest of 2 busbarsBand free, exact MW with Pro
Other figures
Sources retrieved 20 Oct 2026Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Fault level near your switchgear rating? Star Delta Power does the study.
Location
Connection queue
UKPN Embedded Capacity Register 2 (>=1 MW); UKPN Embedded Capacity Register 1 (<1 MW), retrieved 15 Oct 2026
- Queued
- 399 MW
- Connected
- 221 MW
- Projects
- 19
33 kV
1 busbar11 kV
1 busbarBURWELL PRIMARY 33/11kV
UKPNdistribution Source (opens the operator's dataset in a new tab)Planned reinforcement
1 scheme, first in service 2026DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| 1 x 33kV CB, 2 x grid transformers uprated | Load related reinforcement | 2026 |
Data source
Network operator: UK Power Networks. Licence: CC BY 4.0
Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences