Creyke Beck
At a glance
Generation headroom, free
Green
Over 20MW
Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 4 busbarsBand free, exact MW with Pro
Other figures
Sources retrieved 31 Oct 2026Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Fault level near your switchgear rating? Star Delta Power does the study.
Location
Connection queue
NPG Embedded Capacity Register (>=1 MW); NESO TEC Register (live, archive datastore dump), retrieved 31 Oct 2026
- Queued
- 669 MW
- Connected
- 349 MW
- Projects
- 13
132 kV
1 busbarOther voltage levels
- Voltage not statedCreyke Beck NGETNot openly published by NESO
- Voltage not statedCreyke Beck NPGNo capacity or fault data published for this busbar
- Voltage not statedCREYKE BECK 1193 NPGNo capacity or fault data published for this busbar
Planned reinforcement
1 scheme, first in service 2028DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 8.9km of 132kV underground cables | Connections | +0.0 MVA | 2028 |
Data source
Distribution operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Transmission owner: National Grid Electricity Transmission. Licence: NESO Open Data Licence