Hartmoor
At a glance
Generation headroom, free
Green
No headroom
Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 3 busbarsBand free, exact MW with Pro
Other figures
Sources retrieved 15 Oct 2026Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Fault level near your switchgear rating? Star Delta Power does the study.
Location
Connection queue
NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 15 Oct 2026
- Queued
- 479 MW
- Connected
- 57 MW
- Projects
- 21
66 kV
1 busbar20 kV
1 busbarHartmoor 20 kV
NPG Generation LockeddistributionOther voltage levels
- Voltage not statedHartmoor NPGNo capacity or fault data published for this busbar
Planned reinforcement
1 scheme, first in service 2028DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 66kV switchgear & Busbars | Condition | +0.0 MVA | 2028 |
Data source
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences